Solar Energy
Sunshine on your roof, savings on your bill.
We design rooftop PV systems that are sized for how you actually live, batteries that earn their keep, and monitoring you'll genuinely look at. Turn-key from first walk-through to switch-on.

Solar Energy

● Available now
What's included
Everything in one quote.
Below is the full scope of what we deliver under the solar energy banner. Most clients pick a subset — we'll talk through which parts make sense for your building and budget on the first visit.

Rooftop PV systems
Mono-PERC and TOPCon panels from tier-1 manufacturers. Sized to your roof, your shading and your consumption — never sold by the kilowatt.

Battery storage
AC and DC-coupled batteries from 5 to 50 kWh. We run the payback maths transparently so you only buy storage when it earns its keep.

Monitoring & app
Per-panel optimisation and a single dashboard for production, consumption and battery state. Works with your KNX system out of the box.

Maintenance contracts
Annual cleaning, inverter health checks and rapid callout. Most issues we fix before you notice them in the data.
Our process
From walk-through to handover.
Site visit
We measure roof, shading and consumption — bring along the last 12 months of bills.
Design
3D layout with shading model, yield projection and itemised price.
Install
Scaffolding goes up Monday, panels are live by Friday on most jobs.
Monitor
We watch the system for the first 30 days and tune anything that drifts.
Case study
Riverside House — 12kW PV + 15kWh battery
Family home in Baghdad wanted to cover their EV and heat pump without selling back at giveaway tariffs. We sized the system around 78% self-consumption and integrated it with their existing KNX so the car and immersion only run on excess solar.
Self-consumption
Total install
Why clients choose us
The benefits
Common questions
You asked, we answered.
Don't see your question? Drop us a line — a real engineer will reply within one working day.
How long does a typical install take?
A 6–10 kW residential rooftop is usually 3–5 working days from scaffolding to switch-on. Battery installs add another half-day.
Do I need a south-facing roof?
No. East-west splits often produce a flatter daily curve which actually pairs better with batteries and EV charging. We model it for you.
What about grid-feed contracts?
We handle the network operator paperwork (Netzanschluss) start to finish. You'll have a feed-in contract before commissioning.
Will the panels survive hail?
Yes — every panel we fit is rated to IEC 61215 hail testing (25mm hail at terminal velocity). Tempered glass holds up.
Let's Talk
Ready to put the roof to work?
No-pressure site visits. Itemised quotes. Honest timelines.
